iterative earthworks projects: plan, dig, change plan, dig, change plan, dig

paul wheaton ยท 1.6K views ยท 2 months ago
Safety check pending
Description

https://permies.com We explore how extra excavator hours turned into a new access road to Peach Plateau. With a 32-ton excavator on site and time available while waiting for more dirt to reach Fukuoka Flat, a road that previously did not exist was carved out in roughly two hours. The project also opened up possibilities for what Peach Plateau could become. The idea is to eventually build large hugelkultur beds along the edge, create space for RVs, Sprinter vans, and camping trailers, and surround those parking areas with tall gardens for privacy, food production, and a better view. The biggest limitation turned out to be material. There was plenty of rock but not enough good soil to finish the hugelkultur beds at the desired height. Future work may involve gathering more wood, hauling soi