VDAOvideo

Timber Framed Barn Part 33 Door Frame And cladding

Kris Harbour Natural Building · 248K views · 1 year ago
Safety check pending
Description

For the last month I have been working on getting the front door frame in. I had to get the door frame in first because the insulation and batten for the second floor needs to sit on something. Once the frame was done to a point I needed it, we started working on fitting the wood fibre insulation boards, membrane and then batten. I also worked out how to do the corner posts and outside post to break up the long run of cladding. After all this preperation i cladded it. I think it looks great and I am please with how it turned out. Enjoy the video, Thanks for watching.