Week 10 of fixing issues with Qingdao PyraPOD demo (18): Completed the re-install of the inner cover

PyraPOD with SolaRoof · 25 views · 4 months ago
Description

We opened up the inner cover and replaced the original 3/4-inch liquid supply pipe for the liquid cooling system with 1-inch piping, and changed the previous spray setup—where one pump served six nozzles—to a configuration using two pumps, each supplying three nozzles. To achieve this, three solenoid valves were installed on the pipeline of the west-side pump, individually controlling liquid supply to the north and south bubble generators, as well as to the southern zone's spray system. The next step will involve testing natural water cooling (liquid spray in the cavity), forced water cooling (heat exchange between air and thin water film on the reticulated film of the bubble generator), and air cooling (outdoor air intake and exhaust from a higher outlet at the opposite end). More info a