VDAOvideo

Day 32 of fixing issues with Qingdao PyraPOD demo (16): Test bubble filling, liquid cooling & iAVs

PyraPOD with SolaRoof · 24 views · 5 months ago
Description

We’ve installed the final outer cover—the one on the north gable wall at the entrance. After testing the operation of these three zones, we identified some issues that require minor adjustments. The next step is a trial fish-rearing period; if the fish survive, we can stock the fish pond and start growing vegetables on the sand bed. More info at https://pyrapod.com and https://pyrapod.org