Day 136 of fixing issues with Qingdao PyraPOD (25): Sept 12 — Heat Exchange Pipes Are Laid Around

PyraPOD with SolaRoof · 63 views · 2 months ago
Description

On the second day of September 11, the same excavator came to complete the digging and then we laid the PE pipes (63 mm inner diameter) for two rounds. Then the excavator helped us to bury the pipes with dirt and prepared a U-shaped trench that can collect rain water. More info at https://pyrapod.com and https://pyrapod.org