PyraPOD with iAVs in Qingdao (36): On the 36th day after breaking the ground on September 11, 2025

PyraPOD with SolaRoof · 14 views · 1 year ago
Safety check pending
Description

Today we worked on the control box to bring both AC and DC powers. We installed a voice controlled relay to control 8 circuits with 3 options: ON, OFF, Flash ON/OFF. We tested by connecting the fan drawing air from cavity and feeding it into our new type of greenhouse. We then spend a lot of time chauking all the gaps in the gutter with solicone. We got the new pond liner but we are going to wait until we install the bubble generator on the South side, instead of the earlier position on the North. More info at https://pyrapod.com