VDAOvideo

Twin Intake Hydroelectric System Part Two, The Penstock

Kris Harbour Natural Building · 161K views · 1 year ago
Safety check pending
Description

This week with some help I managed to get the pipe installed for the second intake. it was a big job due to the lack of access and long distance to move the pipe. But with hard work and help we managed to get it in. I did have some issues with airlock but after digging a small trench that problem seems to be fixed but time will tell if we need to add an additional standpipe. I also made the manifold and fitted the shut off gate valve. in the next video I will be making the turbine ready for testing once the rain comes.