VDAOvideo

Qingdao Ground-Level iAVs (1): Digging, Assemblying, and Connecting

PyraPOD with SolaRoof · 27 views · 5 months ago
Description

QDigging the ground to lay pipes, assembling galvanized corrugated sheets, and connecting the fish toilet to the pond liner. After some planning, the Qingdao ground-level iAVs aquaponics system is finally ready for assembly. The pond liner has already been connected to the fish toilet using two layers of silicone. We’ll let it sit overnight, and brothers Zhenhua and Liming will finish up tomorrow. https://pyrapod.com