VDAOvideo

PyraTUNNEL design continued: longer tunnel & smarter details of sandponics added to the design

PyraPOD with SolaRoof · 254 views · 4 years ago
Description

This is the continuation of the first video. Air lift pump used for aerating the system and uplifting fish poop to top sand beds. Top bed is broken into two sections to give more lighting to lower bed. Smart regions added to fish tank so that nursery and harvest areas are there with little effort. GoFundMe link has been set up for this project: https://www.gofundme.com/f/pyratunnel-aquaponics-calgary